RHUB TM-510 Specifikace Strana 112

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 353
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 111
TM 9-2350-311-34-1
5-5 AIR CLEANER BLOWER MOTORS — CONTINUED
b. Inspection, Repair, and Test — Continued
10 Test capacitor (20) for continuity. If resistance value is indicated on multimeter, replace capacitor.
11 Inspect impeller housing (39). Replace if cracked or damaged.
12 Inspect commutator end bell (9). Replace if cracked or damaged.
13 Inspect motor cover (3). Repair if cracked, dented, or damaged. Replace if beyond repair.
c. Assembly
1
Install ground wire (38) and repeat step 2
for
second brush assembly holder (29).
2 install brush assembly holder (29), two new lockwashers (26), and two screws (25) to commutator end bell (9).
3 Install clip (37) and screw (36) to commutator end bell (9).
4 Install flat washer (35), two bearings (34), armature (33), stator (32), and motor cover (3).
5 Install two new Iockwasher (31) and two screws (30).
6 Install brush (28), spring (27), electrical lead (6), new Iockwasher (26), and screw (25) to brush assembly
holder (29).
7 Install felt washer (24) and washers (23).
8 Screw impeller (22) to armature (33) and install new self-locking nut (21).
5-30
Zobrazit stránku 111
1 2 ... 107 108 109 110 111 112 113 114 115 116 117 ... 352 353

Komentáře k této Příručce

Žádné komentáře